Fire Station 85 – New ConstructionÂ
Fire Station 85
Status: Complete
Completion Date:
July 2020
Role:
QA QC / Schematic Design / Design Development / Construction Documentation / Fire Department Coordination
Delivery Method:
CMAR
This project was a ground up build of a fire station for HFD. It was a modified design from the standard protype to support trail response needs and increased fitness areas. There were significant site logistics issues with it being placed where a COH dog park was and also significant drainage coming off the back of the mountain onto the site.
Project Photos

The station has three bays to support an engine , ladder , rescue, and a small garage to suppot the trail response vehicle.

Open concept kitchen with stainless steel counter tops. Also strategically positioned acoustic dampening materials used to avoid sound reverberations

Watershed from the mountains had to be diverted to the rear of the station.

Expanded gym area with roll up door to utilize rear app bay ramp for PT activities

Converted the space into 14 individual dorm rooms with individual alerting and individual climate controls. Created six individual bathrooms with two strategically located alongexit pathway to the apparatus bay. Reworked office an utility areas to provide for more functionality and increase capabalties. A laundry room was created to allow for laundeering of station uniforms and bedding and keep seperation from items going into the app bay and returning to the station. A dedicated utility room was also created to keep ice machine and water softner oout of the apparatus bay.

Dorm hallway with straight shot to app bay to reduce turnout time and collisions walking around corners

Lobby with secure access to Fire Station living quarters
_JPG.jpg)
Site with the dog park removed and before station construction began


Watershed from the mountain had to be diverted to behind the station.Â

Station positioning was critical to support ladder truck turning radius and allow for drainage control

Pictured left - Coverted a small conference room and open lobby space into six new offices to support expanding staff needs for the FTC
Pictured below - Converted a group style shower and typical bathroom stalls into completely enclosed shower rooms, bathrooms and also an ADA compliant bathroom and shower


Operational Impacts
Response Times not reduced during construction
Minimized turnout times through optimized phasing and positioning of crews during renovation processes
Improved Facilities
Provided multiple washers and dryers so crews would not use turnout extractors for laundering non PPE items
Staffing Efficiency
Designed to maximize operational workflow and allow for crew continuity. The crew office was intentionally left open to the kitchen and dining table to allow for better crew cohesion
System Resiliency
The building was reinforced to meet current code standards and ensure it was reslient to any impacts
Future Growth Flexibility
The Fire Training Center and the Fire Station both lacked enough workspace areas in todays heavily dominated computing environment. Extra offices and workspaces were created to alleviate this issue